
Home
| Services | Past Productions
| Links | Contact
Les Miserables
– Student Edition
April 2008
Major projects included a 30’ diameter turntable, the barricade, the
The turntable was built in place on stage and consisted of 4 pie sections
which rode on 75 fixed casters.
The barricade and
The bridge flew in to connect the two
Here is a video of the turntable
installation.
Home
| Services | Past Productions
| Links | Contact