Home | Services | Past Productions | Links | Contact

 

Les Miserables – Student Edition

Huntsville High School

Huntsville, Alabama

April 2008

 

Major projects included a 30’ diameter turntable, the barricade, the Paris unit, and the bridge.

The turntable was built in place on stage and consisted of 4 pie sections which rode on 75 fixed casters.

The barricade and Paris units were designed to move on and stage without the crew being seen.

The bridge flew in to connect the two Paris units and was also used independently during the suicide scene.

 

Here is a video of the turntable installation.

 

 

 

 

 

 

 

 

Home | Services | Past Productions | Links | Contact